Details Page for Planning Application - 2025/1615/P

Site Address61 Gloucester Crescent London NW1 7EG 


Application Progress Summary

  • The statutory requirement for consultation on planning applications is a minimum of 21 days. The online comments form is linked to the statutory time period and will close after this time.

    If the online comments form has closed, you can still comment via email to [email protected]

    We will take account of all representations received right up until an application is determined.

    Please note that if the Comments Until date shown is before the Application Registered date this is because either:
      •  we are not required to consult on the application (you can check this in our
         Statement of Community Involvement); or
      •  the formal consultation period has not yet started by the application being advertised in the
         local newspaper or site notice(s) being put up at the application site.

  • Application Registered17-04-2025 
  • Comments Until18-05-2025  
  • Date of Committee 
  • DecisionGranted  19-12-2025
  • Appeal Lodged 
  • Appeal Decision   

Application Details

  • Application Number2025/1615/P
  • Site Address61 Gloucester Crescent London NW1 7EG 
  • Application TypeHouseholder Application 
  • Development TypeResidential Minor Alterations 
  • ProposalAlterations to existing front boundary brick wall and pier to provide enlarged vehicular access space, installation of black cast iron automated sliding vehicular gate and pedestrian gate, replacement composite wood bin store in front garden, and replacement of concrete paving to existing driveway with sandstone paving.  
  • Current StatusFINAL DECISION 
  • ApplicantMs Luita Iesha Elysia Lin 
  • AgentMBBM Studio Architects 
  • WardsCamden Town 
  • Location Co ordinatesEasting 528680 Northing 183828 
  • OS Mapsheet  
  • Appeal Submitted?No 
  • Appeal Decision 
  • Case Officer / TelTony Young  2687   
  • DivisionPlanning Solutions Team 
  • Planning OfficerTony Young 
  • Determination LevelMembers Briefing 
  • Existing Land UseC3 Dwelling House 
  • Proposed Land UseC3 Dwelling House